Requirements: Android 2.3 and up
Size: 270MB
Rating: 4.5/5
Type: Strategy
If you’ve never played it before, the Worms game series is basically turn-based artillery strategy mixed with some platforming gameplay. Each player controls a team of earthworms, and need to wipe the other team off the map. Your worms can crawl, jump, leap, teleport, swing, and jetpack across the destructible terrain, and use a wide variety of weapons to dispatch your enemies. These include rocket launchers, guns, baseball bats, and grandmas. The game is full of fun and you must play it to experience it!
Worms 4 for Android features:
• Brand New Weapons: Wreak havoc with an assembly of brand new weapon designs including Hailey’s Comet!
• Weapon Upgrades: Worms 4 is designed to be a very rewarding play experience. Players can collect more than a hundred weapon upgrades to make their worms more powerful! Weapon upgrades can be mixed and matched to better suit the player’s strategy.
• Five Gorgeous Locations: Do battle in five beautiful hand drawn regions: Middle Turf, Candiville, Wacky-Habara, Tomorrow Islands and the Fro Zone.
• 80 Single Player Missions: Test your skills against 80 single player missions. Missions are designed not only to provide the player with hours of enjoyment, but also to teach the finer points of Worms playing strategy!
• Factions: Each player in the game chooses an allegiance, fighting under the banner of Red or Blue! The daily tug of war competition pits faction against faction, with the winners reaping the benefits of extra in-game rewards!
• World Events: Each week dynamic events take place around the game’s world map. The player enters into these events and competes against other players, with the aim of representing their faction and earning prizes for fellow faction members.
• Fantastic Customisation Options: As always, Worms 4 features a plethora of great customisation options, allowing the player to individually customise each worm and give their team the personal touch!
• Daily Challenges: Partake in fun optional daily challenges to earn yourself and your faction additional rewards!
• Loot: Spin the loot wheel and break open the loot chests to gain truckloads of rewards and customise every aspect of your worm!
• Connect with Friends: Connect your Facebook account to battle your friends in online multiplayer or view your friend’s progress on the world map screen and compete to beat their scores.
